News

Galling: Why Stainless Fasteners Seize and What Prevents It
2026-10-23
Stainless threads seize because two clean surfaces of the same alloy cold-weld under pressure. The mechanism, why impact drivers make it worse, and the assembly habits that keep a joint serviceable years later.
Sensitisation: Why a 304 Weld Can Rust Along the Seam
2026-10-23
Chromium carbide forms in the band beside a weld and takes the element that keeps the metal stainless out of circulation. How the mechanism works, why travel speed and fit-up decide the outcome, and what a buyer can reasonably ask for.
When a Part Arrives Wrong: Fault, Cause and What Good Faith Looks Like
2026-10-16
A wrong delivery covers several different problems. This article separates transit damage, wrong variant, dimensional deviation and specification gaps, and explains how to record what you see and what good faith looks like from both sides.
Repair or Replace: Deciding What to Do With a Damaged Part
2026-10-16
Deciding what to do with a damaged part starts with the cause, not the crack. This article covers reading damage before touching it, where repair is routine, where welding changes the part, section replacement and honest replacement.
Repeat Orders and Change Requests Across a Long Project
2026-10-16
Long builds generate repeat orders and change requests. This article covers what makes a repeat simple, when a change beats a repeat, version control across stages, how to issue a change properly, tooling wear and matching new parts.
Storing Fabricated Metal Parts Before Fitting
2026-10-16
A fabricated part often spends months in storage before it is fitted. This article covers chloride and carbon-steel contamination, keeping grades apart, supporting long assemblies, silicone storage and protecting parts during a pause.
What a Purchase Order Should Specify for Custom Metalwork
2026-10-16
Custom work has no part-number shorthand, so the order has to carry the specification. This article sets out what to record about identity, grade, finish, tolerance, quantity, shipping, inspection and change control.
Batch Size and How It Changes the Way a Part Is Made
2026-10-16
Quantity is a process input, not only a commercial one. This article explains how a one-off job, a short series and a production run differ in tooling, fixtures, setup effort and the way consistency is inspected across a batch.
Page 7 of 20
Total 20 Pages
Go To